English
Login
3D printers
Materials
Parts & Accessories
Software
3D Models
Industries
Community
Help
Academy
Blog
Company
Support
Prusa CORE One
CORE One conversion kit (1.01)
8. Trim, Door & xLCD | Tools necessary for this chapter
1. Tools necessary for this chapter
Step 1 of 44 (Chapter 11 of 13)
Contents
Comments
⬢
For the following steps, prepare:
⬢
2.5mm Allen Key
⬢
T10 Torx Key
⬢
Needle-nose pliers
Loading...
Next
Contents
CORE One conversion kit (1.01)
1A. Introduction
1B. MK4S Inspection
1C. Printer Disassembly
1D. Component Prep
2. Base assembly
3. Back assembly
4. Heatbed assembly
5. CoreXY assembly
6. Nextruder assembly
7. Bodywork & Electronics
8. Trim, Door & xLCD
Tools necessary for this chapter
Top cover: parts preparation
Removing the foil
Test-fitting the top cover
Assembling the top cover I.
Assembling the top cover II.
Testing the ventilation
Installing the top cover
Side covers: parts preparation
Removing the foil
Covering the left side
Covering the right side
xLCD version info
xLCD: parts preparation (A)
Assembling the xLCD I. (A)
Assembling the xLCD II. (A)
Installing the FE Faston connector (A)
xLCD (B): parts preparation (Part 1.)
xLCD (B): parts preparation (Part 2.)
Assembling the xLCD front cover (B)
Covering the xLCD (B)
Installing the LCD knob
xLCD bezel: parts preparation
Mounting the xLCD I.
Mounting the xLCD II.
Installing the xLCD assembly
Securing the xLCD assembly
Door seal: parts preparation
Attaching the top seal
Attaching the side seals
Magnet holders: parts preparation
Assembling the magnet holders
Installing the magnet holders
Hinges: parts preparation
Installing the door-hinge-in parts
Installing the door-hinge-out I.
Installing the door-hinge-out II.
Door panel: parts preparation
Door panel: removing the protective film
Installing the door panel
Assembling the door handle
Securing the door handle
Haribo time
Done
9. Calibration & First run
Manual changelog
Comments
Log in
to post a comment
No comments