[Updated: October 2nd, 2018] We estimate to have the textured powder-coated sheets available separately on the e-shop for MK3/MK2.5 owners during October 2018. We had many issues setting a stable production where our manufacturer of the sheets is constantly tweaking the process. The $10 vouchers with free shipping for ordering these will be released shortly after the sheets are added on the e-shop. (Eligible orders are the ones without a sheet selection, before March 2018, that received the default sheet version, orders directly selecting sheet with the smooth double-sided PEI to shorter lead time are not eligible.) Also, the smooth double-sided PEI sheets are available for separate purchase on the e-shop for MK3 kit or printer owners right now!

Current lead times for new orders

Updated: October 16th, 2018

The dates are only an estimation and rely on the actual production. We're doing our best but please be aware that it can shift up to one extra week for the lead time. Or we can positively surprise and ship a bit sooner.

Product

Lead time

Original Prusa i3 MK3 kit with smooth PEI sheet - (the fastest option)

IN STOCK

Original Prusa i3 MK3 kit with powder-coated sheet

2 weeks

Original Prusa i3 MK3 complete with smooth PEI sheet

3 weeks

Original Prusa i3 MK3 complete with powder-coated sheet

4 weeks

Original Prusa i3 MK2S kit

1 week

Original Prusa i3 MK2S complete

3-4 weeks

Original Prusa i3 MK2.5 upgrade

4-5 weeks

Original Prusa i3 MK3 upgrade

3-4 weeks

Original Prusa i3 MK3 Multi Material 2.0 upgrade kit (New orders to be shipped at the end of January 2019)

4 months

Multi Material upgrades v2 and MK3 ordered together with redesigned Multi Material upgrades - we started shipping at the end of August 2018 (after beta testing phase), a majority in September, October and November, new MMU for MK3 orders at the end of February 2019. If you want your printer sooner, please contact our support at info@prusa3d.com to split your order, we'll help you.
There is a production delay for which we apologize regarding MK2 MMU to MK2.5/MK3 MMU (MM upgrades of V1 to V2), with different electronics and different voltage (12V vs 24V), there was an additional development and testing needed, shipping is expected to start in the second half of October. Last firmware tweaks are being implemented and final preparations and tests are being run, shipping will commence soon.

Detailed shipping table for Original Prusa i3 MMU 2.0 for MK3 and MMU 1.0 to 2.0 upgrade

Updated: October 16th, 2018

Week

Ordered

MMU 2.0 for MK3

MK2 MMU to MK2.5/MK3 MMU

42/2017

Before October 23, 2017

Already shipped

Period before the release

43/2017

October 23 - October 29, 2017

Already shipped

From October, 23

44/2017

October 30 - November 5, 2017

Already shipped

From October, 23

45-48/2017

November 6 - December 3, 2017

Already shipped

From October, 29

49/2017-1/2018

December 4, 2017 - January 7, 2018

Already shipped

From October, 31

2-4/2018

January 8 - January 28

Now shipping

From November, 5

5-8/2018

January 29 - February 25

Now shipping

From November, 5

9-14/2018

February 26 - April 8

Now shipping

From November, 5

15-16/2018

April 9 - April 22

From October, 18

From November, 12

17-19/2018

April 23 - May 13

From October, 22

From November, 12

20-22/2018

May 14 - June 3

From October, 29

From November, 19

23-25/2018

June 4 - June 24

From November, 5

From November, 26

26-27/2018

June 25 - July 8

From November, 12

From November, 26

28-29/2018

July 9 - July 22

From November, 19

From December, 3

30-32/2018

July 23 - August 12

From November, 26

From December, 3

33-34/2018

August 13 - August 26

From December, 3

From December, 10

35-36/2018

August 27 - September 9

From December, 10

From December, 17

37/2018

September 10 - September 16

From December, 17

From December, 17

38/2018

September 17 - September 23

From January, 7

From January, 7

39/2018

September 24 - September 30

From January, 14

From January, 14

40/2018

October 1 - October 7

From January, 28

From January, 28

41-42/2018

October 8 - October 21

From February, 4

From February, 4

Detailed shipping table for MK3 and MK2.5 orders

Updated: October 16th, 2018

The dates are only an estimation and rely on the actual production. We're doing our best but please be aware that it can shift up to one extra week for the lead time. Or we can positively surprise and ship a bit sooner.

Week

Ordered

MK3 kit
(smooth PEI)

MK3 kit
(powder-coated)

MK3 assembled
(smooth PEI)

MK3 assembled
(powder-coated)

MK2.5 upgrades

1 - 27

January 1 - July 8

Already shipped

Already shipped

Already shipped

Already shipped

Already shipped

28

July 9 - July 15

Already shipped

Already shipped

Already shipped

Already shipped

Already shipped

29

July 16 - July 22

Already shipped

Already shipped

Already shipped

Already shipped

Already shipped

30

July 23 - July 29

Already shipped

Already shipped

Already shipped

Already shiiped

Already shipped

31

July 30 - August 5

Already shipped

Already shipped

Already shipped

Already shipped

Already shipped

32

August 6 - August 12

Already shipped

Already shipped

Already shipped

Already shipped

Already shipped

33

August 13 - August 19

Already shipped

Already shipped

Already shipped

Already shipped

Already shipped

34

August 20 - August 26

Already shipped

Already shipped

Already shipped

Already shipped

Now shipping

35

August 27 - September 2

Already shipped

Already shipped

Already shipped

Now shipping

Now shipping

36

September 3 - September 9

Already shipped

Already shipped

Already shipped

Now shipping

Now shipping

37

September 10 - September 16

Already shipped

Now shipping

Now shipping

Now shipping

Now shipping

38

September 17 - September 23

Already shipped

Now shipping

Now shipping

From October 22

From October 22

39

September 24 - September 30

Now shipping

Now shipping

Now shipping

From October 29

From October 29

40

October 1 - October 7

Now shipping

From October 22

From October 22

From November 5

From November 5

41

October 8 - October 14

Now shipping

From October 29

From October 29

From November 12

From November 12

42

October 15 - October 21

From October 16

From November 5

From November 5

From November 19

From November 19



How did we do?